CENTRALIZED WASTEWATER TREATMENT

Main Article Content

Chamala Muthu
Agamuthu P

Abstract

An assessment was conducted of an integrated wastewater treatment plant (WWTP) in Malaysia. The WWTP has been designed to receive multiple effluents from central utility facilities (CUF) and other neighboring plants with varying wastewater characteristics. Commissioning of the plant was necessary as part of the quality assurance for the plant design specification. Operating units of the WWTP during commissioning are the intake collection, effluent monitoring, primary treatment operation, waste homogenizing and biological unit of processes. The assessment includes the monitoring of average flow rate, total suspended solids (TSS), oil & grease (O&G), pH, temperature, chemical oxygen demand (COD), dissolved oxygen (DO), and mixed liquor suspended solid (MLSS). The total COD loading in this plant is 1488 mg/l and at the final discharge point the COD reading was 63 mg/L. It shows that the WWTP has the COD removal rate of 96%. The total TSS loading is 331 mg/L and at the final discharge point the TSS reading was 27 mg/L. The DO reading was very satisfactory throughout the 2 months pre-commissioning period with an average reading between 3.0 to 4.0 mg/l and during the commissioning period of 8 days, an average DO reading of 4.2 mg/L was observed. The average MLSS reading was 1690 mg/L. The integrated WWTP is considered operating within the DOE Standard B discharge limit.

Downloads

Download data is not yet available.

Article Details

How to Cite
Muthu, C., & P, A. (2004). CENTRALIZED WASTEWATER TREATMENT. Malaysian Journal of Science, 23(2), 89–101. Retrieved from http://jummec.um.edu.my/index.php/MJS/article/view/8417
Section
Original Articles

Most read articles by the same author(s)